DrillTronics detects possible pack-off 7 minutes before incident

DrillTronics detects possible pack-off 7 minutes before incident

Objective Investigate pack off NPT during 7” liner run. Lost hole section. Symptoms not identified by rig or RTOC Solution Customer requested ‘Blind Trial’ with Sekal DrillTronics to see if DrillTronics would have helped Results DrillTronics triggered 1st action 7...
10-15% reduced tripping time compared to traditional simulations

10-15% reduced tripping time compared to traditional simulations

Objective Following clean up cycle at TD of 8 ½” section, due to limiting high PP at TD of section (1,18sg) optimization of tripping is required Solution Drilltronics dynamic surge / swab protection was in use from section TD until surface to optimize tripping speed....